A sustainable office building with a load bearing precast concrete façade.
The site is located within the First Street masterplan at the southern gateway to Manchester. The proposal provides circa 370,000 sqft of Grade A office workspace across two buildings.
The load-bearing façade celebrates the primary form of construction, reduces embodied carbon and acts as solar shading for the inset glazing. The precast concrete façade has a polished finish to the outer face to reflect light into the office floorplate.
At the crown of each building, the façades are folded to form external terraces. Internal winter gardens and terraces are provided on each floor to promote health and wellbeing with the workplace.
At street level, an urban glass house unifies the two buildings, creating a unique centre piece to the scheme.
Marshalls CDPL
370,000 sqft Office Space